Published on 07.08.2024

Greenwell Lane footpath closure

The Greenwell Lane footpath will be temporarily closed as Northumbrian Water install a new water connection.

The expected work dates are 09/09/2024 – 13/09/2024

Full details of the disruption can be viewed here: https://one.network/?tm=139788290